Skip to content
Home / Frequently Asked Questions

Frequently Asked Questions

Considered design and carefully delivered details, tailored to your space and your requirements.

Projex World / Dubai, UAE

Answers to common questions about our interior fit-out, landscape, artificial rock, water feature, carpentry, flooring and technical services.

Planning a project can involve several connected decisions. These answers explain how Projex World approaches project scope, quotations and service coordination in Dubai. For details on a particular service, visit its dedicated page below.

01 / Start a project

Working with Projex World.

What services does Projex World provide in Dubai?

Projex World provides design and turnkey fit-out, themed environments, landscaping and artwork, artificial rock features, water fountains, carpentry and joinery, specialist flooring, and MEP, HVAC and electrical services. The exact scope is confirmed for each project.

What types of projects does Projex World work on?

Our work spans residential, commercial, retail and hospitality spaces, along with bespoke environments. The proposed service and deliverables depend on the site, intended use and project brief.

What information should I send to request a project quotation?

Share the Dubai project location, space type, approximate area or dimensions, photos, drawings if available, the work you need and your preferred timing. A clear brief helps us identify the next steps and any information still needed.

Can I combine multiple Projex World services in one project?

Yes. Services such as interior fit-out, custom joinery, MEP coordination, landscaping and water features can be considered together when they form part of the same brief. We review the interfaces and define the responsibilities in the proposed scope.

How are project costs and timelines confirmed?

Quotations and programmes are prepared around the agreed work scope, site conditions, materials, access, coordination needs and any required approvals. We confirm project-specific pricing and timing after reviewing the available information.

02 / Design and fit-out

Interior spaces and custom details.

Do you provide interior design and fit-out together?

Yes. Design and fit-out can be planned as connected parts of a project, from space planning and finish selection through the agreed installation and finishing work. See our design and turnkey fit-out services in Dubai.

Can Projex World work from existing interior drawings?

Existing drawings and specifications are useful starting points. We review them alongside the site condition and requested work before confirming whether more measurements, details or design development are needed.

Can custom carpentry and joinery be included in an interior project?

Yes. Fitted wardrobes, kitchen cabinetry, TV units, feature walls and bespoke furniture can be scoped to suit the layout and selected finishes. Visit our carpentry and joinery page.

Do you handle residential and commercial fit-out in Dubai?

Yes. We work across homes, offices, retail and hospitality interiors. The project brief, site conditions, operating needs and agreed scope shape the fit-out approach.

03 / Landscape and themed features

Outdoor spaces, water and rockwork.

Can landscaping, artificial rockwork and water features be planned together?

Yes. A coordinated brief can consider the garden layout, planting, sculpted forms, pool surroundings, water movement and lighting together. Explore our themed environments, landscape and art services.

Do you design indoor and outdoor fountains in Dubai?

Yes. We plan water features for settings such as gardens, villa courtyards, reception areas and hospitality spaces. Basin, pump, drainage, waterproofing and maintenance access are considered for the selected location. See artificial water fountains in Dubai.

Can artificial rock features be designed for an existing pool or garden?

They can be considered for existing spaces, subject to the layout, structure, water exposure, access and installation requirements. Photos, measurements and a site review help define a suitable artificial rockwork scope.

04 / Technical and flooring services

Building systems and specialist finishes.

What MEP, HVAC and electrical services do you provide?

Our listed technical services include MEP and HVAC works, HV and LV electrical works, panel fabrication and installation, cable laying and termination, transformers, substations, power distribution, testing and maintenance. The work package is agreed against project documents and site requirements. See MEP, HVAC and electrical services.

Is epoxy flooring suitable for a garage or commercial floor?

Epoxy flooring may suit garages and some commercial spaces, depending on the concrete condition, expected use, exposure and selected system. We assess the substrate and requirements before confirming a proposed floor finish. Read about epoxy flooring services in Dubai.

Can pebble carpet flooring be used on outdoor paths or terraces?

Pebble carpet may be suitable for selected paths, terraces and entrance areas, subject to exposure, drainage, substrate and edge details. The site and intended use should be reviewed before choosing a system. See pebble carpet flooring in Dubai.

Villa renovation in Dubai

How do I decide which rooms to renovate first?

Prioritise leaks, failing services and rooms that limit everyday use. Group rooms that share plumbing or electrical routes so the same finishes do not need to be opened twice.

What affects the cost of a villa renovation in Dubai?

The largest variables include the amount of demolition, changes to plumbing and air conditioning, the condition behind existing finishes and the materials selected. Ask for itemised allowances and a clear list of exclusions.

Can a villa renovation be done in phases?

Yes, if each phase has a practical stopping point. Agree how dust, access and utilities will be managed, and decide where flooring or other finishes must continue into the next phase.

Can my family stay in the villa during renovation?

It depends on whether you can retain a usable bathroom, safe access and essential services. Review the demolition and service shutdown programme before deciding whether to move out temporarily.

How can I avoid surprises when renovating an older villa?

Gather previous drawings and repair records, then inspect visible signs of moisture and prior alterations. Ask the contractor to identify concealed conditions that could change the scope once work starts.

Should I replace villa flooring throughout or room by room?

Continuous flooring works best when adjoining levels and door clearances allow it. Room-by-room replacement can suit phased work, provided transitions are designed in advance.

When should I select tiles and sanitaryware for a villa renovation?

Choose items with concealed connections before plumbing and wall details are finalised. Check lead times for specialised or imported pieces before fixing the programme.

Can I move the kitchen or a bathroom during a villa renovation?

Check drain routes, ventilation, water connections and the structure before committing to the layout. Existing floor levels can limit where new drainage can run.

What should I check before removing a villa partition?

Have the wall assessed for structural function and concealed services before demolition. Record what the assessment identifies and include any required approval or specialist work in the brief.

How should I compare villa renovation quotes?

Compare demolition, reinstatement, finishes, service changes and waste removal against the same drawings. Ask each contractor how they price variations and what allowances still need confirmation.

What should be included in a villa renovation handover?

Request finish schedules, equipment manuals, warranty terms and records of changes to concealed services. Walk each room and assign a completion date for outstanding work.

Explore design and turnkey fit-out ↗

Artificial rock features

What is an artificial rock feature?

It is a shaped and textured feature designed to resemble natural rock. The construction method depends on the size, location and whether it must carry water or conceal equipment.

What makes artificial rock look natural up close?

Study the reference stone for layers, fracture lines and colour variation. Use a sample with enough area to judge texture and check it in daylight and under the planned lighting.

Can artificial rock be used around a swimming pool?

It can be designed for pool surrounds when the finish, attachments and substrate suit splash and cleaning exposure. Keep pool fittings, access covers and the pool edge accessible.

Can artificial rock hide water pipes or lighting cables?

Yes, where access for inspection and replacement is designed in. Identify valves, drivers and connections before shaping the feature and agree how service panels will open.

How do I choose the right size for an artificial rock feature?

Mark its proposed height and footprint on site. Review it from the primary seating area and circulation routes to see how it affects views and clearance.

Can a rock feature be designed to match existing landscaping?

Use photographs or samples of nearby stone, paving and planting to set a palette. Review the new finish against those materials in the light conditions it will actually face.

What finish should I sample for an outdoor artificial rock wall?

Request a panel showing highlights, darker recesses and the expected texture. If water will run over it, review the sample wet as well as dry.

How does lighting change the appearance of artificial rock?

Lighting across the surface emphasises texture and shadow. Test the position after dark and check for glare from seats, windows and paths.

Can a damaged artificial rock surface be repaired?

Local repairs may be possible once the cause is identified. Ask for a small test where a patch must blend with weathered texture and colour.

How do I clean an artificial rock feature?

Start with the finish supplier’s care guidance and use an inconspicuous area for any trial. Use a method suitable for the coating and keep debris clear of pump intakes on water features.

Can artificial rock be installed indoors?

Yes, if the support, fixing method and access suit the building. Indoor features also need coordination with lighting, adjacent finishes and, where applicable, water management.

Explore artificial rock design and installation ↗

Rock works and rockwork installation

What should a rock works brief include?

Show the site, dimensions, intended look, viewing angles and any water, planting or lighting it must accommodate. Include photographs of access routes and the surfaces the feature will meet.

When should rockwork be planned in a landscape project?

Plan it before finalising levels, drainage and service routes. Early coordination gives the team space to install supports and waterproofing before surrounding finishes close in.

Can rock works use natural stone as well as artificial rock?

A project may use either or combine them. Compare achievable shapes, loads, handling access and the desired finish before deciding where each material belongs.

What should be checked before rockwork is installed on a terrace?

Have the support and expected loads reviewed. Include saturated planting, a full basin if applicable and maintenance access in that review.

How can equipment reach a garden with a narrow entrance?

Measure gate widths, corners and overhead clearances before settling on component sizes. A sectional design or work built in place may be more practical than moving large pieces through.

How should rockwork meet paving or decking?

Detail the edge so water can drain and movement can be accommodated. Keep access covers clear and agree how the paving will finish around irregular shapes.

Can rockwork be built beside an existing planted area?

Yes, subject to access, root protection and irrigation routes. Mark plants to retain and make sure soils and drainage can be reinstated after installation.

What should I look for in a rock works quotation?

Check whether the price includes support, preparation, sculpting, colouring, service coordination and reinstatement. Ask who is responsible for basin waterproofing if water is involved.

How do I plan for future repairs behind built rockwork?

Use an access panel or an accessible route from behind wherever pipes or connections may need attention. Keep a record of concealed routes at handover.

How can I assess rockwork before signing off on the project?

Compare the finished extent and profile with the agreed design, inspect seams and edges, and test lighting or water systems included in the scope before closing the snag list.

Explore artificial rock works in Dubai ↗

Artificial fountains and water features

What types of artificial fountains suit villa courtyards?

A wall fountain can save floor space, while a freestanding basin can serve as a centrepiece. Compare the approach views, pathway clearances and access needed to remove the pump.

What affects the price of installing an artificial fountain in Dubai?

The basin, waterproofing, pump, controls, finish materials and service routes all affect the quotation. An existing basin may still need investigation before reuse can be priced.

How do I plan for splash around an outdoor fountain?

Observe the effect of wind, jet height and basin depth. Check where water lands at the intended flow before choosing nearby finishes or seating positions.

Can a fountain recirculate its water?

A recirculating fountain pumps water from the basin back to the outlet. It still needs a plan for water lost through evaporation, splash or cleaning.

Why should fountain pump access be shown on the drawings?

The pump and strainer must be reachable for servicing and removal. Draw the proposed route and confirm that access will remain practical after the stonework and planting go in.

Can an outdoor fountain be added to an existing garden?

Often, if power, water management, drainage and equipment access can be accommodated. Review paving levels and the available routes before choosing a location.

How can an indoor water feature be kept quiet?

Review the drop height, basin finish, flow and pump mounting. Test the sound from the nearest seating or reception desk before accepting the settings.

What should be specified for a fountain basin?

Define the waterproofing system, joints, pipe penetrations, overflow and drain. Assign responsibility for checking each interface and testing the basin before finishes cover it.

Why does a fountain pump lose flow?

Debris at the intake, low basin water or another system problem can affect output. Note when the change occurs and arrange inspection if routine cleaning specified for the unit does not restore flow.

How can I plan fountain lighting for easy maintenance?

Show light fittings and cable routes on the design, including where drivers or controls can be reached. Confirm how a fitting can be removed without dismantling permanent finishes.

What should be handed over after fountain installation?

Request pump and control manuals, operating settings, a plan showing concealed components and a care schedule. Ask for a demonstration of the agreed controls and service access.

Explore artificial water fountains ↗

Interior fit-out in Dubai

What does a turnkey interior fit-out include?

The agreed scope may cover coordination, construction and installation through handover. Ask for a package breakdown showing which design, service and finish items are included.

What information do I need for an office fit-out quotation?

Share the floor plan, headcount, meeting and storage needs, proposed finishes and building requirements. Identify workstations or equipment that will be retained or supplied separately.

What can delay an interior fit-out?

Drawing changes, long-lead finishes, limited delivery hours and access restrictions can affect the programme. Confirm decision dates and the building’s work rules early.

How should MEP be coordinated with a fit-out design?

Overlay the layout and ceiling plan with routes for air conditioning, lighting and other services. Review access panels, grilles and connections before joinery and ceilings are released.

Can a fit-out be done in a working office?

Phasing can work when occupied areas and construction are safely separated and shutdowns are planned. Agree the noisy work windows and how people will reach desks and amenities.

What is the difference between a fit-out allowance and a fixed price?

An allowance is an amount carried for an item whose final specification or quantity is still open. Ask how the price will change once the item is selected or measured.

When should I order materials for a fit-out?

Confirm lead times while developing the programme. Release materials once the relevant measurements and selections are approved, especially for bespoke joinery and imported finishes.

How should I plan an interior fit-out for a retail shop?

Start with the customer route, display and storage needs. Get the landlord’s requirements for the shopfront, signage and work access before settling the scope.

Can I retain existing floors and ceilings in a refurbishment?

Yes, where they suit the new layout and are in adequate condition. Check how new partitions, doors and service changes will meet the retained finishes.

What should I check on an interior fit-out snagging visit?

Operate doors and hardware, inspect visible finishes, and check that equipment and service panels can be reached. Record each issue with a location, owner and target date.

How do I compare interior fit-out contractors in Dubai?

Ask each contractor to price the same drawings, scope and finishes. Review exclusions, programme assumptions, variation terms and the deliverables included at handover.

Explore interior fit-out services in Dubai ↗

Carpentry and custom joinery

Which dimensions are needed for a custom carpentry quote?

Provide the overall height, width and depth, along with photos and intended use. Identify sockets, skirting, openings and walls that look uneven so the installer can verify clearances on site.

Should I choose laminate or veneer for bespoke joinery?

Laminate gives a consistent pattern and finish, while veneer gives natural grain variation. Compare samples, edge details, cleaning needs and how each would be repaired.

Can a built-in wardrobe fit against an uneven wall?

Usually, a scribed filler or other planned edge detail can take up differences. Confirm final site measurements before fabrication and agree what the finished junction should look like.

How do I plan access panels inside cabinets?

Map valves, sockets, drivers and filters before drawing the cabinet. Check whether technicians can remove or operate equipment with drawers and doors in their normal positions.

What should be included in a kitchen joinery drawing?

Show cabinet interiors, appliances, hinge direction, worktop openings and service points. Confirm appliance dimensions and required ventilation before production.

How can I match new carpentry with existing cabinets?

Review the original finish under the same lighting and compare full-size samples. Edge profiles, sheen and grain direction can matter as much as colour.

What materials should I discuss for joinery near sinks?

Discuss the substrate, sealed edges, finish and ventilation together. Pay particular attention to bottom edges and pipe openings where splashes or leaks can reach them.

Can a TV wall conceal cables and still allow upgrades?

Yes. Specify a route with removable access, space for connectors and ventilation for equipment. Record where cables run so components can be replaced later.

What hardware should I specify for commercial cabinetry?

Match hinges, runners and handles to usage frequency, door weight and serviceability. Confirm how replacements can be sourced and check clearances against nearby furniture.

What should I inspect at a carpentry handover?

Open every door and drawer, test catches and check alignment, seams and edge finishes. Collect the material and hardware references for maintenance or future repairs.

Explore carpentry and joinery ↗

Microtopping floors and wall finishes

What is microtopping?

Microtopping is a thin decorative cement-based finish applied in layers over a prepared surface. It can create a continuous look where the base and chosen system are compatible.

Is microtopping the same as polished concrete?

Microtopping is an applied finish. Polished concrete uses the concrete surface itself, which is mechanically ground and polished. Their installation methods and appearance differ.

Can microtopping be applied over existing tiles?

A compatible system may be applied over firmly bonded tiles after inspection and preparation. Loose tiles, movement, pronounced joints and height changes need to be resolved first.

Will cracks in the base show through microtopping?

Movement or cracking in the base can show through the finish. Inspect the substrate, diagnose existing cracks and follow the system requirements for joints and preparation.

Is microtopping suitable for bathroom walls?

Some specified systems may suit selected wet locations. Check the full waterproofing and finishing build-up, including corners, penetrations and care requirements.

How do I choose a microtopping colour?

Review a physical sample with the proposed sealer under the actual room lighting. Hand-applied texture and movement can look different across a full wall or floor.

What affects the cost of microtopping flooring in Dubai?

Surface repairs, levelling, detailed edges, available access and the chosen coating and sealer influence cost. Quotes should describe substrate preparation and finishing steps.

Can microtopping be used on stairs?

Suitability depends on the base, stair edge profiles, expected traffic and surface performance. Ask for a drawing or sample of the tread, riser and nosing junction.

How long before a new microtopping floor can be used?

Follow the selected system’s curing schedule and site conditions. Ask for separate dates for light foot traffic, furniture placement and routine cleaning.

How do I maintain a microtopping floor?

Use cleaners approved for the sealer, remove abrasive grit and protect the floor from furniture dragging. Ask for the care sheet and guidance on when the sealer may need renewal.

Carpet stone and pebble carpet flooring

What is carpet stone flooring?

Carpet stone, often called stone carpet or pebble carpet, uses natural stone aggregate bound together as a continuous finish. Confirm the exact aggregate, binder and sealing system in any quotation.

How does carpet stone compare with smooth epoxy flooring?

Carpet stone shows the colour and texture of exposed aggregate, while smooth epoxy typically has a more uniform appearance. Compare cleaning, traffic and exposure before selecting a system.

Can carpet stone go over an existing concrete floor?

A sound, clean and compatible base may be suitable after preparation. Assess moisture, cracks and contamination before agreeing the build-up.

Can rainwater drain through carpet stone?

Some open-textured systems allow water through the surface, while sealed systems behave differently. The substrate, falls and outlet design still determine how the area drains.

How do I choose a carpet stone finish around a pool?

Review the specified wet slip performance, aggregate comfort and cleaning requirements. Check the edge next to the pool and the route water will take after splash or rain.

What affects the installed price of carpet stone in Dubai?

Aggregate choice, binder, base preparation, edge profiles and area size influence the quote. Ask whether it includes repairs, levelling and any seal or topcoat.

Can carpet stone be installed on stairs and ramps?

It may suit selected installations if the surface, nosing, edge details and drainage match the intended use. Ask for a junction sample before approving the specification.

How should carpet stone meet tile or timber flooring?

Set the finished levels and agree a transition profile before installation. Protect the aggregate edge and allow for movement of the adjoining material.

How do I clean carpet stone flooring?

Use the care instructions for the selected resin and sealing system. Remove grit routinely and check the approved process for lifting spills from the aggregate texture.

Can a small area of damaged carpet stone be repaired?

A local repair can be possible after the cause is addressed. A retained aggregate sample can help match colour and grading, although weathering may leave a visible difference.

How do I choose aggregate size and colour for stone carpet?

Compare sealed physical samples by eye and underfoot. Look at wet and dry appearance, ease of cleaning and how the aggregate meets doors and transitions.

Explore pebble carpet flooring ↗

05 / Next step

Have a question about your project?

Send us the location, photos or drawings you have and a short description of the work. Our team can review the brief and discuss the right next step.

Call +971 54 429 5179 or email info@projexworld.com.

Contact Projex World ↗

Related services / Dubai

Explore our services.

Dubai / Find us on Google

Your next space starts here.

Connect with Projex World Technical Services LLC in Al Quoz, Dubai, for interior design, turnkey fit-out, custom carpentry, landscaping and specialist technical services. Explore our business profile, read customer reviews or get directions to our location.

Projex World Technical Services LLC
Hassan Abdulla Bahri Compound, Warehouse E-23-A,
17A Street, Al Quoz Industrial Area 2, Dubai, UAE.
+971 54 429 5179 · info@projexworld.com